| Set as Homepage | Save desktop | Chinaexporter | Mobile | QR code

Shandong Electric Power Construction Corporation (SEPCOIII)

wind power project

Introduction
Product Categories
  • No Category
Search
 
Link
  • No Links
The company hasn't been verified!
You are now at: Home » Introduction
Introduction
Shandong Electric Power Construction Corporation (SEPCOIII) is a professional engineering enterprise in terms of EPCO, EPC, BOT, BOO, PMC and so on in electric power sector. The Spectrum of SEPCOIII’s business line mainly spans thermal power project, nuclear power project, gas-fired power project, hydropower project, wind power project and biological power project. By corporate Financial and Capital Utilization, involved with many fields, such as design, ocean shipping, commissioning and operation, SEPCOIII provides with package solution ranging from addressing, design, equipment supply to installation and commissioning for power plants.

 

    Since being founded in 1985, SEPCOIII has aggregated installed capacity of 20000MW, with single unit capacity ranging from 12MW to 1000MW, which means that SEPCOIII has the highest annual average installed capacity in Chinese electric power sector. SEPCOIII has won “Luban Prize”--- the highest national distinction for high project quality --- for six times, which makes the company one of the most winning enterprises in China. SEPCOIII has become the only electric power construction corporation, which has got two "Lunban Prize" at once, when both the Zou Xian Project and the Wei Fang Project were awarded "Lunban Prize" in the year of 2008.

    SEPCOIII is one of the few companies in China which have the capacity to integrate EPCO resources. SEPCOIII is ranked as one of the top 225International engineering contractors by American Engineering News Record (ENR) in four years in succession, ranked 79 in 2010.  In 2002, SEPCOIII has successfully entered into overseas market, thus it’s the first Chinese international EPC contractor in electric power construction sector. And, SEPCOIII has ranked in the list of top 225 International Contractors of Engineering News-Record for five years and ranked 58 in 2011. SEPCOIII is awarded with Credit AAA by China international contractors association, and is the only company with this laurel in this industry. At present, SEPCOIII spans his business across India, Nigeria, Jordan, Saudi Arabia, Oman, Indonesia and Singapore. Besides, SEPCOIII also builds strategic cooperation relationship with many famous companies in America, Germany, Japan and so on.

 

    SEPCOIII creates his own brands in construction in terms of 300MW grade, 600MW grade and 1000 MW grade. In 2007, unit No.8 of Zouxian 1000MW Power Plant built by SEPCOIII creates the highest record in China and reaches the first level in the world with trial operation time of 9 days and 19 hours. Because of the superexcellent implementation of the project and exquisite processing quality, SEPCOIII has become an outstanding brand known in Indian and Nigerian markets. In November, 2006, Mr. Wang Lujun, Chairman of SEPCOIII accompanied Mr. Hu Jintao, Chinese President to visit India. At present, the high-quality projects in Nigeria, India and Jordan built by SEPCOIII are highly acknowledged by the owners for short construction period, high quality and nice service.    Nigerian president Obasanjo complimented SEPCOIII sincerely in the operation ceremony of Papalanto Power Plant.  He said, this is a world-class power plant built by SEPCOIII-a world-class power plant construction corporation. Also, the project Manager, Mr. Fang Yibo, was conferred the title of cacique, as the first Chinese citizen who got the honor, which issue was reported by many domestic and foreign major media. 

    SEPCOIII has a scientifically-managed, experienced and technically-advanced professional team with cutting-edge generating technology. The human resources of SEPCOIII have three distinctive features: first, middle management, senior executives and all technicians and engineers have profound experience in project execution. Second, the senior executives are all internationally experienced and emphasize the importance of customer focus and service-orientation and have good relations to all our clients and partners. Third, SEPCOIII has a well-educated and inter-disciplinary team. Our core staff is proficient in a variety of languages and qualified in design, installation and logistics to support our clients with practical help to solve any problems.

 

    SEPCOIII possesses more than 200 sets of large-sized construction machines such as international advanced CC2500-1(500t) crawler crane,CC2200 (350t) crawler crane、CC1400 (250t) crawler crane that enable the Company to undertake several large-sized projects like the largest single unit of 1000MW at the same time.

 

    SEPCOIII always persists in the company mission of “Building Excellent Project, Satisfying Customers and Promoting the Development of Society”, the core value of “Integrity, Innovation, High Efficiency and Responsibility”, and the cooperative concept of “Sincere Cooperation and Win-win Development”. We sincerely welcome friends around the world to cooperate with us for our win-win development.

Company Profile
Company Name: Shandong Electric Power Construction Corporation (SEPCOIII) Company Type: Enterprise ()
Area: China Company Size:
Registered Capital: N/A Registered Year: 1985
Validated:
Security deposit: Already paid 0.00 USD
Business Scope: wind power project
Business:
Computer Products / Power Supply